TPW - Land Development Presubmittal Resource Documents
TPW - Land Development Presubmittal Resource Documents
Overview
TPW Land Development Section is responsible for review and permitting of Stormwater Management, roadway construction, ROW improvements, erosion and sediment control, and floodplain management.
For projects that involve disturbance of more than one acre, are within 200ft of state waters, or creating/replacing 5,000 sq ft or more of impervious surface a Stormwater Management Conference is required prior to plan submittal.
Please review the Transportation and Public Works Plans Review checklist prior to submittal of plans to verify that all required items have been provided.
Projects disturbing an acre or more require a three phase ES&PC plan with the applicable GSWCC checklist. If not provided, plans will not be reviewed.
Project requiring stormwater design require a complete hydrology and hydrological study demonstrating compliance with technical standards. If not provided, Stormwater Management plans will not be reviewed.
If project is required to be built in phases, please ensure construction and ES&PC plans reflect proposed phasing.
Before TPW can issue any permits showing work within GDOT ROW, proof of GODT approval is required. Email proof of approval to TPWsubmissions@accgov.com.
Before issuing permit, if working in GDOT ROW, a letter or email from GDOT showing they have approved the proposed work is required to be submitted to TPWsubmissions@accgov.com.