Sub-Project 2: Riverbend Road

Project Details

The sub-project is to Project Concept Design for sidewalk along one side of Riverbend Road connecting the sidewalk College Station Road to S. Milledge Ave. 

Project Updates

Concept design was presented to the public for comment on October 14, 2019 and was presented to M&C on November 12, 2019. M&C directed concepts be developed further before being brought to M&C for consideration.  Staff currently working on a task to develop multiuse path concepts with cost estimates. Task to include, cutting the project into two segments. Proposed Project Concepts, College Station to Milledge Ave, with cost estimates on each segment for sidewalk and for multiuse-path were presented at the December 9, 2020 Work Session https://youtu.be/R9GSOQqIGNc?t=8568.  

To preview the current concepts visit the website https://www.accgov.com/9121/Riverbend-Road-Sidewalks.

*as of 12/15/2020