Building Permits and Inspections Department Presubmittal Resource Documents

Overview

  • In the presubmittal phase of a project reach out to Building Inspections to verify questions regarding occupancy and construction classification, particularly if it is a mixed-use project.
  • Cover sheer must include:
    1. Occupancy
    2. construction type,
    3. code Reference section
    4.  which automatically requires a resubmittal
  • For mixed-use projects, a table, which breaks down the square footage and location(s) of each different occupancy and construction classification type, may be required at the time of Plans Review submittal.
  • Plans for Commercial Plans Review must be stamped.
  • A structural engineer will determine if special inspections are required, which ACC Building Inspections will verify during Plans Review.          

     Presubmittal resources