Road & Lane Closures
Closure Notes
Red text indicates new closures or revisions made to existing closures this week. All road and lane closures are scheduled pending weather conditions. View the Lane Closure Form to request a lane closure. Email Engineering@accgov.com for more information.
Red text indicates new closures or revisions made to existing closures this week. All road and lane closures are scheduled pending weather conditions. View the Lane Closure Form to request a lane closure. Email Engineering@accgov.com for more information.
Road Closures | |||
Foundry Street from Dougherty Street - Parking deck | January 14, 2021 | Prince Avenue school ice skating event | The Classic Center |
Jackson Street from Broad Street to Clayton Street |
January 12 - 22, 2021 |
Remove Brick Culvert |
ACC Streets & Drainage |
Magnolia Street from W. Broad Street - Rose Street | January 13 - 21, 2021 | Catch basin repair | ACC Streets & Drainage |
Nowhere Road from Freeman Drive to Cabernet Street |
January 4 - 15, 2020 |
Repair Failing Pipe |
ACC Streets & Drainage |
Sidewalk | |||
Broad Street from Lumpkin Street to College Avenue |
December 28 - January 30, 2020 |
Construction | J Davis Construction |
College Avenue from Hancock Avenue to Dougherty Street |
December 28 - January 7, 2020 |
Lift for Painting |
Frankie Gartrell |
E Broad Street from Hickory Street - Wilkerson Street | January 25 - February 5, 2021 | Weaver D's ramp improvement | Landmark Urban Construction |
Hancock Avenue from Lumpkin Street to College Avenue |
January 2 - 5, 2020 |
Painting |
Frankie Gartrell |
Talmadge Drive from Prince Avenue - Upper drive through at hospital | February 3, 2020 - February 3, 2022 | Demo of existing building and construction of new building | Alan Densmore, Inc. |
Lane Closures | |||
Athens Road from Cherokee Road - Winter Street | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
1230 Baxter Street from Alps Road - Magnolia Street | December 1 - 31, 2020 | Installation of AT&T cran equipment | AT&T |
Baxter Street from S Finley Street - E Cloverhurst Avenue | December 9 - January 9, 2021 | Installation of AT&T cran equipment | AT&T |
Baxter Street from S. Newton Street - S. Hull Street | December 9 - January 9, 2021 | Installation of AT&T cran equipment | AT&T |
Boley Drive from Commerce Road - Freeman Drive | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
College Avenue from Hancock Avenue to Dougherty Street |
December 28 - January 7, 2021 |
Lift for Painting |
Frankie Gartell |
Gaines School Road from Cedar Shoals Drive to Barrington Drive |
January 11 - February 8, 2021 |
Pipe work |
ACC Streets & Drainage |
Lavender Road from Jefferson Road - Tallassee Road | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Macon Highway from Puritan Road - Garden Lane | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Mitchell Bridge Road from Tallassee Road - Atlanta Highway | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Mulberry Street from E Broad - N Poplar Street | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Nowhere Road from Danielsville Road - County line | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Oak Grove Road from Walton Creek Road - Old Jefferson Road | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Old W Broad Street from Holman Avenue - Sunset Drive |
January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Old Jefferson Road from Kathwood Drive - Peachtree Lane | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
S Church Street from Dearing Street - Waddell Street | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
S Hull Street from Waddell Street - Baxter Street | December 9 - January 9, 2021 | Installation of AT&T cran equipment | AT&T Mobility |
S Lumpkin Street from Sleepy Creek Drive - Eaglewood Way | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Tallassee Road from Mitchell Bridge Road - County line | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Tallassee Road from Westchester Drive - Mill Drive | January 12 - 14, 2021 | Road repair | Streets & Drainage |
Timothy Road from Autumnwood Avenue - Rhodes Drive | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Timothy Road from St James Drive - Cheatham Road | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Vincent Drive from Newton Bridge Road - Jefferson River Road | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Whitehall Road from Barnett Shoals Road - County line | January 11 - February 8, 2021 | Tree trimming | ACC Landscape Management |
Lane Restrictions | |||
Athens Avenue | January 10 - February 13, 2021 | Patching, milling, paving, striping, utility adjustments crack seal, & speed tables, | Pittman Construction |
Armor Court | January 10 - February 13, 2021 | Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Ashbrook Drive | January 10 - February 13, 2021 | Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Ashbrook Court | January 10 - February 13, 2021 | Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Azalea Drive | January 10 - February 13, 2021 | Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Baxter Street | January 10 - February 13, 2021 | Patching, milling, paving, striping utility adjustments, crack seal, & speed tables | Pittman Construction |
Bishop Drive | January 10 - February 13, 2021 |
Patching, milling paving, striping, utility, adjustments, crack seal, & speed tables | Pittman Construction |
Blackmoor Court | January 10 - February 13, 2021 | Patching, milling, paving, striping, utility adjustments, crack seal & speed tables | Pittman Construction |
Booker Street | January 10 - February 13, 2021 |
Patching milling, paving, striping, utility adjustments, crack seal & speed tables | Pittman Construction |
Branch Street | January 10 - February 13, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Buckington Terrace | January 10 - February 13, 2021 |
Patching, milling & paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Catalpa Way | November 8 - December 12, 2020 |
Patching, milling, & paving | Pittman Construction |
Cedar Shoals Drive |
January 10 - February 13, 2021 |
Patching, milling, & paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Cellar Court | January 10 - February 13, 2020 |
Patching, milling, & paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Chase Street | January 10 - February 13, 2020 | Patching, milling & paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Churchill Circle | January 10 - February 13, 2021 |
Crack seal, patching, milling, & paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Coile Drive | November 8 - December 12, 2020 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
College Station Road |
January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables | Pittman Construction |
Davis Estates | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Davis Street | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Deerfield Run | November 8 - December 12, 2020 |
Patching, milling, & paving | Pittman Construction |
Dublin Street | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
E Broad Street | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
E Cloverhurst Street |
January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
E Hancock Avenue | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
E. Rutherford Street | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Eastwood Court | January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Epps Bridge Parkway |
January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
First Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Fourth Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Fox Trace | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Gaines School Road |
January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Greystone Terrace | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Helican Springs Road | November 8 - December 12, 2020 |
Patching, milling, paving | Pittman Construction |
Henderson Extension |
January 10 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Herman Street | June 7 - December 12, 2020 |
Chip seal, Crack Seal, Patching, Milling, and Paving |
Pittman Construction |
Herring Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Hillside Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Holly Lane | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Holman Avenue | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Honey Tree Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Hoyt Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
John Collier Road | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Julious Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
King Avenue | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Lavender Lakes Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Lombardy Place | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Lullwater Road | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Madison Avenue | November 1 - December 12, 2020 | Crack seal, patching, milling, and paving | Pittman Construction |
Maple Circle | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Martin Circle | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Mell Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Middleton Court | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Milledge Court | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Mitchell Bridge Road |
December 30, 2020 |
Patching | Pittman Construction |
Morton Avenue | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Mulberry Street | June 7 - December 12, 2020 |
Chip seal, Crack Seal, Patching, Milling, and Paving |
Pittman Construction |
N Chase Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Northforth Court | November 8 - December 12, 2020 |
Patching, milling, paving | Pittman Construction |
N Homewood Hills | November 8 - December 12, 2020 |
Patching, milling, paving | Pittman Construction |
N Jackson Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Oglethorpe Terrace | January 11 - February 8, 2021 |
Patching, milling, paving | Pittman Construction |
Oneta Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Parris Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Pinecrest Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Pottery Street | September 27 - December 12, 2020 | Crack seal, patching, milling, and paving | Pittman Construction |
Prince Place |
January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Pulaski Street |
January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Putters Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Putter Place | November 8 - December 12, 2020 |
Patching, milling, paving | Pittman Construction |
Riverbend Road | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Riverhill Court | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Riverside Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Ruthwood Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Saint George Court | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Saint George Drive | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Saint George Place | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Sassafras Way | January 11 - February 8, 2021 |
Crack seal, patching, milling, and paving |
Pittman Construction |
S. Finley Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
S. Hull Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
S Lumpkin Street | January 11 - February 8, 2021 |
Striping | Pittman Construction |
S Lumpkin Street from West Lake Drive to Old Princeton Road |
January 4 - 8, 2020 |
Mill and Pave |
SEC |
|
|||
S Pope Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
S Rocksprings Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Sylvan Road | November 8 - December 12, 2020 |
Patching, milling, paving | Pittman Construction |
Third Street | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Travis Drive | January 11 - February 8, 2021 |
Patching, milling, paving | Pittman Construction |
Vaughn Road | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Vine Street | January 11 - February 8, 2021 |
Chip seal, Crack Seal, Patching, Milling, and Paving |
Pittman Construction |
Virginia Avenue | January 11 - February 8, 2021 |
Crack seal, patching, milling, and paving | Pittman Construction |
Waddell Street |
January 11 - February 8, 2021 |
Crack Seal, Patching, Milling, and Paving |
Pittman Construction |
Washington Drive | January 11 - February 8, 2021 |
Crack seal, patching, milling, and paving | Pittman Construction |
West Lake Drive from Milledge Circle to West Lake Court |
January 4 - 8, 2020 |
Mill and Pave |
SEC |
Westview Road | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Whitehall Road | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Windy Hill Court | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Woodridge Circle |
January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Wood Valley Court | January 11 - February 8, 2021 |
Patching, milling, paving, striping, utility adjustments, crack seal, & speed tables |
Pittman Construction |
Special Events
Martin Luther King Jr Parade and Music Fest 2021 Washington Street; Pulaski Street; Clayton Street; Thomas Street; College Avenue; Washington Street between Lumpkin Street and Pulaski Street |
January 18, 2021 |
Celebrate the legacy and ideology of MLK and encourage culture, diversity, and inclusion in Downtown Athens |
United Group of Artists & AADM |