 Road Closures
Hull Street from W. Washington Street - Clayton Street 10:00am - 12:00pm August 12, 2019 Forklift load out Morton Theatre
 Indiana Avenue from 205 Johnson Drive - 195 Indiana Avenue  August 15, 2019  Tree removal with crane  Bears Tree Service
 Longview Drive   August 12 - 13, 2019  Emergency Tree removal  ACC Landscape Mgmt
Sidewalk 
  Baxter Street from S. Milledge Avenue - 350 S. Milledge Avenue
 May 13 - August 7, 2019
 Surveying, tree removal, wall construction, sidewalk construction
  Sol Construction
 Broad Street in front of Star Bucks (8:00am - 2:00pm)  August 19 - 20, 2019  Pump insulation foam  Drew Dekle Construction
 Childs Street from Prince Avenue - Barrow Street February 4 - August 8, 2019 
 Intermittent sidewalk closure to allow trucks to enter and leave project site  Barnett Shoals Corporation
 Clayton Street from Hull Street - Pulaski Street (7:30am - 6:30pm)  August 19 - 30, 2019  Painting and repairs  Joma Construction
 Epps Bridge Road from Old Epps Bridge Road - Chateau Terrace  September 1 - October 1, 2019  Install new Cingular Wireless small cell equipment  AT&T; Ansco & Associates
 Gaines School Road from Cedar Creek Drive - Cedar Shoals Drive  June 10 - August 16, 2019  Turn lane construction at the new Hilsman Middle School  Simpson Trucking & Grading
 MLK Jr. Parkway from Ruth Street - North Avenue  July 18 - August 18, 2019  Remove and replace catch basin manhole and sidewalk  Georgia Development Partners
 Nellie B Avenue - Cone Drive  September 1 - October 1, 2019  Install new Cingular Wireless small cell equipment  AT&T; Ansco & Associates
 175 N Lumpkin Street from Broad Street - Clayton Street (8:00am -5:00pm)  August 8 - 9, 2019  New awning being installed  Character Built Construction
 Prince Avenue from Marty's at Midday - Square 1 Fish  July 30 - August 12, 2019  Off load materials from tractor trailer  Barrett Development
 Prince Avenue from Pulaski Street - Childs Street  March 11 - August 22, 2019  Trucks entering and exiting construction site  Barnett Southern Corporation
 Pulaski Street from Prince Avenue - Barrow Street (SB lane to be closed on an as needed basis)  February 11 - August 22, 2019  Construction  Barnett Southern Corporation
 S. Barnett Shoals Road from Greencrest Drive - Forest Road  September 1 - October 1, 2019  Install new Cingular Wireless small cell equipment  AT&T; Ansco & Associates
 S. Jackson Street from Fulton Street - South Street  September 1 - October 1, 2019  Install new Cingular Wireless small cell equipment  AT&T; Ansco & Associates
 Southview Drive from S. Milledge Avenue - Agriculture Drive (9:00am - 4:00pm)  July 9 - October 28, 2019  Surveying, tree removal, wall & sidewalk construction  Sol Construction
 Sunset Drive from Oglethorpe Avenue - Gilmer Street (9:00am - 4:00pm)  August 12, 2019  Install water taps and meters  ACC Meter Management
 Talmadge Drive from Prince Avenue - Pine Needle Road (8:00am - 4:30pm)  July 30 - August 18, 2019  Utility placement  Cable East, Inc.
 Virginia Avenue from Boulevard Avenue - Dubose Avenue (7:00am - 7:00pm)  July 29 - August 23, 2019  Gravity sewer installation for ACC  Site Engineereing Inc.
 W. Clayton Street from 269 W. Clayton Street - N. Hull Street  August 26, 2019  Loading material with crane  Whitco Roofing Inc.
 Lane Closures
 Alps Road from Broad Street - Beech Creek Drive  July 14 - August 16, 2019  Replacing gas main  Southeast Connections for Southern Company
 898 Barber Street from Waterwork - Alexander Street  June 27 - August 10, 2019  Replacement of overhead passageway  Burke Industrial, Inc.
 Baxter Street from 1060 - 1077  July 23 -26, 2019  Repave crosswalk  ACC Streets & Drainage
 Baxter Street from S. Milledge Avenue - 350 S. Milledge Avenue  May 13 - August 7, 2019  Surveying, tree removal, wall construction, sidewalk construction  Sol Construction
 Boulevard Avenue from 380 - 296 (7:00am - 7:00pm)  July 29 - August 2, 2019  Gravity sewer installation for ACC  Site Engineering
 Broad Street from Thomas Street - Pulaski Street  September 6 - 30, 2019  Christmas lights  ACC Landscape
 Childs Street from Prince Avenue - Barrow Street  March 11 - August 22, 2019  Trucks entering and leaving 100 Prince Avenue project site  Barnett Southern
 Clayton Street from Pulaski Street - Thomas Street  September 6 - 30, 2019  Christmas lights  ACC Landscape Management
 Epps Bridge Road from Chateau Court - Race Trac  August 21, 2019  Provide service for storage facility  AT&T
 Epps Bridge Road from Old Epps Bridge Road - Chateau Terrace  September 1 - October 1, 2019  Install new Cingular Wireless small cell equipment  AT&T; Ansco & Associates
 Estelle Avenue from 104 - 106  August 7, 2019  Install sewer tap  ACC Meter Management
 Finley Street from Baxter Street - Cloverhurst Avenue  August 8 - 10, 2019  University Housing Move in  UGA Housing
 Florence Drive from Atlanta Highway - 225 south of Florence Drive  August 12 - 21, 2019  Installation of sanitary sewer line   Mach 1 Site Developement, LLC
 Gaines School Road from Cedar Creek Drive - Cedar Shoals Drive  June 10 - August 16, 2019  Turn lane construction at new Hilsman Middle School  Simpson Trucking & Grading
 Hawthorne Avenue from Broad Street - Oglethorpe Avenue (intermittent lane closure)
 July 8 - August 8, 2019
 Installing Fiber
 Parker Systems
 Nellie B Avenue - Cone Drive  September 1 - October 1, 2019  Install new Cingular Wireless small cell equipment  AT&T; Ansco & Associates
 Oglethorpe Avenue from Clover Street - Sunset Drive (9:00am - 4:00pm)  August 5 - 9, 2019  Install water taps and meter  ACC Meter Management
 Prince Avenue from Barber Street - N Milledge Avenue  July 29 - August 12, 2019  Median vegetation work  Athens-Clarke Landscape Management
 Prince Avenue from Pulaski Street - Childs Street (Intermittent)
8:00am - 5:00pm
 February 4 - August 22, 2019 
 Construction; Trucks entering and leaving the 100 Prince project site  Barnett Southern Corporation
 Research Drive from S. Barnett Shoals Road - College Station Road (7:30am - 3:30pm)  August 12 - 26, 2019  Tree work  ACC Landscape Management
 S. Barnett Shoals Road from Greencrest Drive - Forest Road  September 1 - October 1, 2019  Install New Cingular wireless small cell equipment  AT&T; Ansco & Associates
 S. Jackson Street from Fulton Street - South Street  September 1 - October 1, 2019  Install New Cingular wireless small cell equipment  AT&T; Ansco & Associates
  1675 S. Lumpkin Street from Milledge Circle - Carton Terrace
  July 1 - August 1, 2019
  Install new Cingular Wireless dba small cell equipment on utility pole
 AT&T Mobility; Ansco & Associates
 S. Milledge Avenue from 2500 S. Milledge Avenue - Whitehall Road
 March 18 - August 30, 2019
  Construction of round-a-bout
 Vertical Earth
 300 S. Rocksprings Street  August 6, 2019  Install water tap and meter  ACC Meter Management
 Southview Drive from S. Milledge Avenue - Agriculture Drive (9:00am - 4:00pm)  July 9 - October 28, 2019  Surveying, tree removal, wall & sidewalk construction  Sol Construction
 Talmadge Drive from Prince Avenue - Pine Needle Road (8:00am - 4:30pm)  July 30 - August 18, 2019  Utility placement  Cable East, Inc.
 Thomas Street from Broad Street - Dougherty Street  September 6, 2019  Christmas lights  ACC Landscape Management
 200 Timothy Road from Macon Highway - Rhodes Drive  May 24 - October 5, 2019  For vehicle access only  Atlanta Gas Light Company
 W. Clayton Street from 269 W. Clayton Street - N. Hull Street  August 26, 2019  Loading material with crane  Whitco Roofing Inc.
 Whitehall Road from 1055 - 895 March 18 - August 30, 2019  Construction of round-a-bout  Vertical Earth, Inc.
 Will Hunter Road from S. Milledge Avenue - end of Will Hunter Road (7:30am - 3:30pm)  August 8 - 26, 2019  Tree work  ACC Landscape Management
Lane Restrictions
 Athens Road (7:00am - 7:00pm)  May 26 - August 24, 2019
 Crack seal, milling, asphalt patching, & paving  Pittman Construction
 Baxter Street (7:00am - 7:00pm)
 August 11 - 24, 2019
 Striping and paving
 Pittman Construction
 Baxter Street from S. Milledge Avenue - 350 S. Milledge Avenue  May 13 - August 7, 2019  Surveying, tree removal, wall construction, sidewalk construction Sol Construction
 Bob Holman Road  June 16 - August 24, 2019  Crack seal, milling, asphalt patching, paving  Pittman Construction
 Bryan Street  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Camelot Lane June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Cardinal Creek Place  June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, aving
 Pittman Construction
Caroline Avenue  June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Clover Street  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Coile Drive  July 21 - August 24, 2019  Asphalt, patching, & paving  Pittman Construction
 College Avenue August 11 - 24, 2019
 Striping and paving
 Pittman Construction
 Dr. MLK Jr. Parkway August 11 - 24, 2019
Striping and paving  Pittman Construction
 E. Hancock Avenue  August 11 - 24, 2019
 Striping and paving
 Pittman Construction
 Falcon Court  June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Greenwood Drive  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Hawthorne Lane  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Helican Springs Road June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Holmes Avenue  June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Holmes Court  June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Huntington Road  June 16 - August 24, 2019
  Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Jefferson Place  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Jimmie Daniel Road June 16 - August 24, 2019
  Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Laurel Springs Drive  July 21 - August 24, 2019  Asphalt, patching, & paving  Pittman Construction
 Layla Court  July 21 - August 24, 2019  Asphalt, patching, & paving  Pittman Construction
 Lillian Drive  July 21 - August 24, 2019  Asphalt, patching, & paving  Pittman Construction
 Marion Drive June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 McElroy Drive June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 McHenry Drive June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Miles Street  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Milledge Circle  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Moose Club Drive  June 16 - August 24, 2019
  Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Mountain Laurel Run  June 16 - August 24, 2019
  Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Nacoochee Avenue  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Oglethorpe Avenue August 11- 24, 29, 2019
 Striping and paving
 Pittman Construction
 Pine Needle Road  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Pineview Drive   June 16 - August 24, 2019
  Crack seal, milling, asphalt patching, paving
 Pittman Construction
Rhodes Drive June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Roberts Road June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Shawnee Drive June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Sleepy Creek Drive  June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 Smithonia Road June 16 - August 24, 2019
 Crack seal, milling, asphalt patching, paving
 Pittman Construction
 S. Harris Street   June 21 - August 24, 2019  Asphalt, patching, and paving  Pittman Construction
 S. Milledge Avenue from 2500 S. Milledge Avenue - Whitehall Road
  March 18 - August 30, 2019
 Construction of round-a-bout
 Vertical Earth, Inc.
 Southview Drive from S. Milledge Avenue - Agriculture Drive (9:00am - 4:00pm)  July 9 - October 28, 2019  Surveying, tree removal, wall and sidewalk construction  Sol Construction
 Tawnyberry Drive  July 21 - August 24, 2019  Asphalt, patching, and paving  Pittman Construction
 Valley Road  June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 Valleybrook Drive June 16 - August 24, 2019
 Crack seal and chip seal
 Pittman Construction
 W. Hancock Avenue  August 11 - 24, 2019
Striping and paving  Pittman Construction
 Whitehall Road from 1055 - 895
 March 18 - August 30, 2019
  Construction of round-a-bout
 Vertical Earth, Inc.
 Woodland Hills Drive  July 21 - August 24, 2019  Asphalt, patching, and paving  Pittman Construction
 Yonah Avenue July 21 - August 24, 2019
 Asphalt, patching, and paving
 Pittman Construction
Special Events
Tri to Beat Cancer


 
August 18, 2019
 
Swim, bike, and running event starting at Sandy Creek Park
 
TriToBeat Cancer